ORDER BY 3 PM ET · MON–SAT · SAME-DAY SHIP OR PICKUP
Search our site

By DMV Transfers

T-Shirt Job Cost Worksheet: What to Count Before You Quote

Illustrative concept image.

A custom T-shirt job can look simple until the small tasks start adding up: approving artwork, sorting blanks, trimming transfers, pressing, checking and packing. A useful job-cost worksheet gives those tasks a place before you quote the work. At DMV Transfers, we recommend separating the transfer order from the full garment job so you can see what each number includes.

This worksheet is a planning framework, not a price list or a promise of profit. Fill it with your actual supplier totals and your own labor assumptions. Keep an estimate column and an actual column so the completed job teaches you something useful.

Define the job before calculating its cost

Start with the quantity you must deliver, the blank style and color, the size breakdown, and every print placement. Record the approved artwork version and intended dimensions for each placement. A front-only shirt and a front-and-back shirt should not share an unexplained unit estimate.

Separate sellable garments from samples, setup pieces and any deliberately planned extras. If you purchase additional materials, record why. Do not quietly divide the entire purchase by every blank in the box when only some garments belong to this job.

Build a worksheet that captures the whole order

Copy these rows into your job worksheet
Cost row What to record
Blank garments Actual style, size and color quantities, with the applicable purchase totals.
Transfers The complete transfer order for all required placements, plus separately identified extras.
Inbound costs Shipping and other purchase charges, allocated once rather than repeated under each material.
Preparation labor Artwork handling, approvals, ordering, receiving, sorting and trimming time.
Production labor Setup, pressing, checking, folding and packing time.
Samples and rework allowance Materials and labor deliberately budgeted for samples or possible rework, with the assumption labeled.
Packaging and delivery Bags, labels, cartons and the delivery arrangement for this job.
Other job-specific charges Applicable transaction charges and any other directly attributable costs.

Browse our blank apparel collection when checking garment options, then use the selected variants and current order totals rather than a collection's starting price. Size and color choices belong in the worksheet because the actual order is the cost you need to evaluate.

Count placements before comparing transfer totals

Illustrative counting example: a job requires 24 finished shirts. All 24 have a front design, while 8 also have a back design. The requirement is 24 front transfers plus 8 back transfers, or 32 transfers. It is not 24 of both designs. Any sample or spare transfers would be additional, explicitly recorded quantities.

Use the same artwork dimensions and required counts when comparing purchasing options. Our DTF ordering-method guide explains the available routes. This worksheet does not assume that a gang sheet or individual transfer order is always less expensive.

Give labor an explicit calculation

Write the time allowance for each task, add the minutes, divide by 60 and multiply by the hourly labor rate you choose for estimating. Include your own time even if you do not issue yourself an hourly paycheck. Otherwise, two jobs with very different preparation work may appear equally attractive on paper.

Mark uncertain time estimates as assumptions. After production, replace them with recorded time. If artwork revisions took longer than expected, keep that difference visible rather than hiding it in pressing time. That distinction helps you define the scope of the next quote.

Calculate a job subtotal, then review what it excludes

Add the recorded job costs. Divide that subtotal by the number of finished garments assigned to the job for a cost-per-delivered-garment view. Use the same quantity when comparing your planned selling total with the job subtotal.

The difference between revenue and the costs listed here is not automatically net profit. Rent, equipment ownership, software, insurance and other business expenses may not be included. Keep a separate overhead allowance if you use one, label its method and avoid counting the same expense twice. This is an operational worksheet, not tax or accounting advice.

Close the worksheet after delivery

Before ordering, check the artwork against our pre-upload artwork checklist and record the delivery arrangement using our current shipping and pickup information. Neither an artwork assumption nor an unconfirmed delivery plan belongs in a final quote.

After the job, enter actual purchases, time, delivered quantity and any rework. Note the reason for each meaningful difference. Keep the approved worksheet with the order files so a repeat order starts from evidence, not memory. When your counts and dimensions are ready, choose the matching DMV ordering route and review its current total.